Quantcast
Viewing all articles
Browse latest Browse all 10

Bathroom Progress (or Not)

The bathrooms we started gutting back in early April are still gutted. Granted, every bit of piping including the main stack has been replaced. Out with the cast iron and galvanized steel and in with the PVC and copper. The HVAC and electrical have been updated, and because we’re going all legal with permits and such, we got ourselves sidetracked.

The electrical inspector (a woman!) raised an issue about the ventilation fan we had placed in our main floor bath which led to further questioning which led to us talking to the village and their inspection service which led us to needing to file for an insulation permit which led us to needing to hire someone to come in and apply toxic spray foam insulation (or rip out the studs and rebuild the room and get to use standard insulation).

Baby steps, people. Baby steps.

I will also note that my living room continues to look like a plumbing supply warehouse and the house is huge mess.

Oh, and our garage sale was a success, but here we are, what? 2-3 weeks later, already building up our next “garage sale” pile in the basement. And the garage hasn’t even been fully emptied from our last sale  despite two trips to the charity resale shop with donations.

Also, hubs got laid-off recently, but I’m mostly happy about that. He’s got time to finish the bathrooms now!

 

 


Viewing all articles
Browse latest Browse all 10

Trending Articles